Blog
Erik Flitman
05 Sep , 2025
We set the scope. This guide explains when, where, and why calendars change the rules for moving a large vehicle or load safely and lawfully. Federal baselines — width 8.5 feet, height 13.5 feet, length 53 feet, and gross 80,000 pounds — form the starting point. States vary. That creates interstate complexity. We outline how …
Continue reading "Understanding How DOT Construction Calendars Affect Oversize Freight"
Read More
freedomadmin
05 Sep , 2025
We centralize permit management so your moves stay on schedule. Oversize and overweight trips often need multiple permits across cities, counties, and provinces. That creates paperwork, inspections, and timing risks. We turn complex rules into a clear page of next steps and handle filings end to end. Our team aligns every permit with the vehicle, …
Continue reading "We Simplify Managing Permit Renewals for Long-Term Heavy Haul Projects"
Read More
Alec Duncan
05 Sep , 2025
Collisions with low-clearance structures disrupt freight movement and create hazards for other road users. Impacts often trigger secondary crashes that raise risk to motorists, cyclists, and pedestrians. We see schedules slip and repair bills climb when an avoidable strike occurs. Professional drivers need reliable information before they roll. Combining atlas planning, truck-specific GPS, and validated …
Continue reading "Why Bridge Height Clearances Are a Top Concern for Shippers"
Read More
sufianNasir
05 Sep , 2025
This case study guides carriers and permit teams through a vital corridor that shapes freight flow in the region. The route links port gateways, LAX, Long Beach Airport, and John Wayne Airport, so delays ripple across the broader highway and intermodal system. We explain why the corridor matters for heavy loads and where the biggest …
Continue reading "Big Rig Reroutes I- Idaho Lane Rest Lane Restriction"
Read More
Alec Duncan
05 Sep , 2025
We lay out a clear plan to move heavy equipment through mountain corridors today. Our focus is route risk, timing, and safety so projects stay on schedule. We explain how steep grades and narrow switchbacks shape drive-time and require conservative speeds. We synchronize permits, escorts, and curfews across state lines. That stops holds at borders …
Continue reading "We Share Tips for Avoiding Delays on Oversize Loads Through Appalachia"
Read More
Development Team
05 Sep , 2025
We set the stage for clear, practical guidance on axle limits and safe transport. Federal regulations set a baseline: 80,000 lbs maximum gross weight on the Interstate System. Single axles are capped at 20,000 lbs when centers are ≤40 inches. Tandem axles can carry 34,000 lbs when spacing is >40 inches and ≤96 inches. The …
Continue reading "We Help You Understand Regional Differences in Axle Weight Rules"
Read More
Tylor Bennett
05 Sep , 2025
Interstate 20 stitches more than 1,500 miles from Kent, Texas, to Florence, South Carolina. In Texas, it cuts through Fort Worth, Arlington, Grand Prairie, Dallas and Mesquite, linking key corridors and the I-820 loop. This story explains why drivers faced slow travel in North Texas after recent lane work and a deadly June 30 crash …
Continue reading "Big rig delays around I-20 Dallas-Fort Worth construction zones"
Read More
freedomadmin
05 Sep , 2025
We plan heavy-haul moves with one goal: safe, on-time delivery. Our team maps clear routes and secures permits before every trip. We verify state rules and timing windows so drivers meet each requirement. We translate DOT information into a practical route that avoids low bridges, weight-limited segments, and tight ramps. Our crews use verified map …
Continue reading "We Navigate Top Oversize Load Restrictions on I-10 Across the South"
Read More
John Edwards
05 Sep , 2025
Quick guide: this introduction explains why major preservation work on a key Pacific Northwest corridor matters to haulers planning around I-96 in Detroit. WSDOT’s Revive program affects the Ship Canal Bridge and an eight-mile corridor with lane cuts, weekend closures, and phased express lane rules. Work includes repaving, drain upgrades, and ramp resurfacing coordinated with …
Continue reading "I-96 Detroit construction bottlenecks and oversized trucking Guide"
Read More
hassan
05 Sep , 2025
A major infrastructure undertaking in Georgia is causing significant disruptions to the transportation industry. The I-16 widening project aims to enhance traffic flow and accommodate future growth, but it’s currently resulting in shipping delays that affect just-in-time delivery systems and supply chains. This development has far-reaching implications for the regional economy and infrastructure. As the …
Continue reading "Georgia’s I-16 Widening Leads to Shipping Delays"
Read More