Heavy haul planning tips for I-35 Minnesota construction zones

Freedom Heavy Haul can offer expedited Pickup and Delivery for any size shipment anywhere in the USA. Contact us today for No Hassle, No Pressure Pricing.

Use lessons from a large interstate project to plan smarter. The nine-mile Susquehanna upgrade replaces multiple bridges while keeping two lanes each way and adds five temporary detours. This work, paired with a nearby all-electronic toll gantry and advance signs, offers a clear playbook for heavy-object moves heading into future Midwestern work zones. Watch the data and act early.

Dispatchers and motorists should study how lane management and detours affect long vehicles. Traffic now averages about 27,000 vehicles per day with a high truck share and is forecast to grow. That mix, plus scheduled tolling and signage, can reshape approach speeds and merge zones for long or wide loads.

For fleets, the key facts are simple: sustained phased work, controlled two-lane flow, and tolling that may change route cost and behavior. This is timely news for planners who want to pre-clear alternates, sync permits with active work, and keep timelines steady as projects evolve.

What’s changing on I-81 and why heavy haulers should care right now

Short-term ramp work near Binghamton is already reshaping morning and afternoon flows for heavy moves.

NYSDOT reported left-lane closures at Exit 72A from State Route 17 eastbound to I-81 North during 9 a.m. to 3 p.m. windows. Those lane closures created concentrated slowdowns at peak a.m. and p.m. periods, and motorists were asked to check 511NY and 511PA for updates.

PennDOT’s Susquehanna project keeps two through lanes but uses five temporary detours for ramps and local links. Advance signs and toll notices placed about a mile before key exits change early lane choices. A single ramp closure in new york state can ripple south, compressing merges and raising weaving near shared nodes.

  • Schedule around peak work windows when possible to avoid predictable slow pockets.
  • Pre-brief drivers on Exit 72A geometry, narrowed shoulders, and temporary barriers.
  • Watch portable message signs and check 511NY/511PA before departure to spot pop-up maintenance.

Oversize carrier delays on I-81 Pennsylvania construction routes: tolling, diversion, and timing to watch

Gantry locations and advance signs will push earlier lane changes and affect escort timing near key exits.

PennDOT’s toll plan places a permanent gantry about 800 feet north of the bridges inside Exit 230 and a temporary gantry two miles south during the 2023–2025 work window. Signs sit roughly one mile before Exits 223 and 230 and on local approaches. E‑ZPass will process fastest; toll‑by‑plate carries higher fees and more billing exceptions for multi‑axle vehicles.

Traffic modeling shows ~6% daily diversion to SR 171, US 11, and SR 492. Peak-hour shifts remove about 100–200 vehicles per hour from the bridges and add 80–130 vehicles per hour to the diversion corridor. Most drivers still stay on the interstate north mainline, but surface road conditions and turn pockets will change.

Keeping two through lanes does not eliminate intermittent conflicts. Five temporary detours for ramps and local links introduce merge friction and escort positioning challenges. Pre-trip checks of pavement, shoulder widths, and tight radii on diversion segments are essential.

  • Plan for E‑ZPass to reduce billing issues and speed toll processing.
  • Coach drivers to hold lane discipline through the gantry zone to cut sideswipe risk.
  • Map all five detours into permit time buffers to avoid last‑minute maneuvers.
Issue Expected Impact Action for fleets
Gantry placement (perm. & temp.) Earlier lane shifts; approach speed changes Use E‑ZPass; pre-brief drivers; adjust escort position
6% daily diversion Added volume on SR 171/US 11/SR 492; altered turn pockets Inspect diversion pavement; reroute wide moves if needed
Five temporary detours Intermittent closures and merge friction Map detours into schedules; add permit buffers

Translating I-81 lessons to I-35 Minnesota construction: practical planning for heavy haul

Plan a rolling 30–90 day calendar that syncs permit applications, escort bookings, and phased work windows. Use the Susquehanna model of keeping two lanes through active work while staging local detours as a planning template.

Pre-clear alternates with Minnesota DOT for width and weight and verify shoulder strength, temporary barrier offsets, and taper lengths before dispatch. Rehearse turn-path sweeps on candidate city and county connectors to catch tight turns early.

  • Pre-identify “no-go” lane-shift sites for the heaviest or widest moves.
  • Add contingency windows in permits for daytime maintenance like the new york Exit 72A example.
  • Run a 24-hour and 2-hour conditions check that combines state traveler info with yard-to-yard driver reports.
Risk Impact Mitigation
Early gantry or sign-triggered merges Last-second lane changes; speed harmonization issues Position escorts early; brief drivers on sign placement
Local detour navigation Tighter turns; reduced shoulder space Pre-clear connectors; perform turn-path sweeps
Tolling or funding changes Added trip costs; schedule penalties Adjust rate cards; include toll contingencies

Dispatcher playbook: time-of-day routing, tech, and detour vetting for closures and work zones

A practical dispatcher playbook starts with time-of-day routing and live data feeds to avoid bottlenecks. Plan departures to avoid the 9 a.m.-3 p.m. maintenance window and the late-afternoon p.m. commuter surge where interstate north feeders meet ramps.

Standardize a monitoring stack using 511NY, 511PA, and Minnesota traveler info for minute-by-minute alerts. Combine those feeds with yard checks one hour before roll to catch overnight changes.

Pre-clear alternates for width, weight, turn radii, and shoulder refuge. Keep a live registry of safe staging exits and note where taper lengths or acceleration lanes were shortened.

  • Schedule windows: build buffers that skip peak work periods and high-merge hours.
  • Vet detours: verify posted limits, low-clearance conflicts, and tight turns before committing a convoy.
  • Communicate fast: open a dispatcher-to-escort channel for intra-minute updates when an exit becomes restricted.
Play Why it matters Quick action
Time-of-day routing Reduces queue exposure during peak work Avoid 9 a.m.–3 p.m.; add arrival buffers
Real-time feeds Detects new message-board orders and incidents Link 511NY/511PA and Minnesota traveler info to dispatch
Detour vetting Prevents tight-turn or weight problems Confirm width/weight, clearances, and shoulder space

Looking ahead: staying nimble as construction, closures, and funding models evolve

Build nimble playbooks that convert emerging work updates and toll news into fast, safe decisions for every move. Keep a rolling horizon for multi-year funding and plan buffers that protect schedules and budgets.

Expect short-lived but impactful closures and use standard pre-trip checks and decision trees to react quickly at p.m. peaks. After each run, debrief drivers and escorts to capture real-world lane and road changes.

Invest in continuous training for escorts and drivers on speed harmonization, lane discipline, and staging near tight shoulders. Link traveler-info APIs to dispatch so alerts reach crews in seconds.

Apply the I-81 lessons to I-35 now, and you’ll reduce surprises as new york work and pricing news reshape how motorists behave at merges and gantries.

How it works

People-thumbs up
Step 1

Pricing: Simply fill out the Free Quote Form, Call, or Email the details of your shipment

Simply complete our quick online quote form with your shipment details, call to speak with our dedicated U.S.-based transport agents, or email us at info@freedomheavyhaul.com with your specific needs. We’ll respond promptly with a free, no-obligation, no-pressure, comprehensive quote, free of hidden fees!

Our team has expert knowledge of hot shot, flatbed, step deck, and RGN trailers, ensuring you get the right equipment at the best price for your shipment.

Step 2

Schedule: ZERO upfront cost to begin working on your shipment

At Freedom Heavy Haul, we’re all about keeping it SIMPLE! We require ZERO upfront costs, you only pay once your shipment is assigned to a carrier. Just share your pickup and delivery locations and some basic info, and we’ll take it from there!

For non permitted loads, we can often offer same-day pickup. For larger permitted loads, a little extra time may be required for preparation. Rest assured, no matter the size or complexity of your shipment, we manage it with precision and commitment!

watch
Truck
Step 3

Complete: Pick up → Delivery → Expedited

Heavy hauling can be complicated, which is why it’s essential to trust a team with the experience and expertise needed. Freedom Heavy Haul has specialized in Over-Dimensional and Over-Weight Shipment deliveries since 2010! Rest assured, you’ve come to the right place.

From the time your load is assigned you will be informed every step of the way. Prior to pick-up the driver contact you to arrange a convenient time to load the shipment, at pick-up the driver will conduct a quick inspection of the shipment. Prior to delivery the driver will again schedule an acceptable time and complete final inspection to ensure the load arrived in the same condition.

Good Work = New Work! Trust Freedom Heavy Haul as your future partner for equipment transport.

Map

Freedom Heavy Haul

Specializing in Heavy Equipment Hauling and Machinery Transport

Get Quote