I-75 Ohio lane restrictions disrupting oversize freight deliveries

Freedom Heavy Haul can offer expedited Pickup and Delivery for any size shipment anywhere in the USA. Contact us today for No Hassle, No Pressure Pricing.

This news story summarizes a midday highway incident that caught carriers and drivers off guard. Police response to a stopped vehicle near Galbraith Avenue shut down southbound travel and made local headlines. The sequence unfolded just after 12:30 p.m., and crews cleared the scene around 2:00 p.m.

Drivers faced slow, congested traffic in the afternoon when a truck hauling an oversized load stopped short of an overpass. Authorities moved quickly, blocking roads near Shepherd Lane so the vehicle could reverse under escort. That careful rollback prioritized safety over speed.

This event is one part of a week marked by changing construction zones in Montgomery County. Small incidents like this can ripple into long delays and complicate planning for carriers and the public.

The rest of the article will map the timeline, the on-scene response, traffic impacts, and routing and permitting lessons. Coordination among police, DOT, and the driver kept the situation controlled and shows why cautious decisions matter when clearance risks appear.

Police block I-75 at Shepherd Lane as oversized load reverses after near overpass strike

Shortly after 12:30 p.m., a truck hauling a wide load stopped just before a low overpass near the Galbraith Avenue exit. Officers immediately closed a single lane to protect the bridge and approaching motorists.

Timeline

The initial halt prompted a staged response. What began as a single-lane hold evolved into a full closure near Shepherd Lane.

Officials coordinated an escorted, upstream reversal so the load could exit safely at Shepherd Lane. Traffic cameras captured the maneuver, which lasted roughly two hours and wrapped up around 2:00 p.m.

Location details

The incident occurred on the southbound corridor north of Galbraith Road. The truck reversed under escort to the Shepherd Lane exit to avoid an impact with the overpass.

On-scene response

Police led staged blocks and worked with DOT crews to communicate rolling closures to drivers. The controlled rollback — a load forced reverse operation — prevented structural damage and kept the scene secure.

  • Police escorts managed vehicle flow.
  • Traffic camera footage verified each step of the reversal.
  • All lanes reopened after crews cleared the highway around 2:00 p.m.
Time Action Outcome
~12:30 p.m. Truck halted near Galbraith Avenue exit Initial single lane closure
12:40–1:30 p.m. Police escalate to full closure near Shepherd Lane Safe staging for reverse
1:30–2:00 p.m. Load forced reverse to Shepherd Lane exit under escort No structural damage; cameras recorded event
~2:00 p.m. Crews cleared scene and reopened lanes Traffic flow restored

Why it mattered:The decision to stop short and reverse under protection prioritized safety over speed. The coordinated response—officers, DOT updates, and camera coverage—kept the operation controlled and prevented a potential strike, concluding the story without major damage.

I-75 Ohio lane restrictions disrupting oversize freight deliveries: traffic impact and freight delays

D. A midday reversal to avoid a low overpass created cascading delays across the corridor.

The Shepherd Lane full closure and reverse used about two hours and became a focal point in local news.

Ripple effects for trucks: stalled lanes, afternoon congestion, and staging challenges

The single forced reverse held up multiple lanes and pushed traffic into a tight queue. Trucks waiting behind the incident faced tight staging options and squeezed shoulders.

Drivers who could not find safe pull-offs risked missing hours-of-service windows or scheduled appointments.

Route choices: using the Shepherd Lane exit and alternate paths to avoid low overpasses

Diverting to the shepherd lane exit avoided a bridge strike but added miles for some carriers. That trade-off often beats costly damage or permit violations.

  • Real-time DOT alerts and cameras helped carriers pick exits or detours.
  • Residual slowdowns lingered after lanes reopened as platoons of vehicles dispersed.
  • Carriers reported added costs from missed docks and rescheduling.
Impact Cause Operational challenge Mitigation
Afternoon congestion Full closure for reverse Longer transit times Use cameras and alerts to reroute
Staged trucks Shoulder use and rolling blocks HOS compliance risk Pre-plan safe pull-offs
Cost increases Missed appointments Accessorial charges Dynamic dispatching and audits
Temperature-sensitive loads Extended dwell time Product risk Contingency stops with power

Construction zones and overpass clearances: how current I-75 changes complicate oversize load transport

Work-zone realignments have quietly reduced safe margins under some overpasses, raising routing risks for haulers. These shifts can change shoulder width and the angle of approach, making a familiar route feel different overnight.

Safety and permits: verifying height, lane availability, and timing before dispatch

Pre-trip checks should include current work-zone maps and recent camera stills. Confirm posted structure height for each overpass and compare that to measured deck height plus the load.

Measure the trailer deck and suspension settings. Verify that the planned lane and shoulder clear a trailer plus any boom or overhang. If doubts remain, reroute or delay during off-peak windows.

Police escorts and pilot cars are vital when barriers or paving stages shrink the travel path. A coordinated escort can stage traffic, advise a safe pull-off, or recommend a “forced reverse” to avoid a collision.

“When barriers move, permits must adapt — document checks with screen grabs and camera images,”

This story in the local news shows why carriers must reconcile permit specs with live work-zone conditions. Plan contingencies, secure timing windows, and rehearse actions so a load forced maneuver is a last resort, not a surprise.

What drivers and carriers should do next amid ongoing lane changes and oversize transport needs

A single forced reverse can add an hour or more; act before the p.m. peak to avoid that risk.

Recheck DOT advisories at least two hours before departure and again near the afternoon window. Confirm bridge clearance, shoulder width, and permit details. Preload alternate routing that includes a known exit such as Shepherd Lane so a truck can divert without last-minute guesswork.

Set clear go/no-go rules for a load forced reverse and name who contacts police and pilot cars. Carry current camera links and map layers so drivers can verify conditions before committing to an approach.

Build buffer time into schedules, equip crews with high-visibility PPE, and time-stamp every coordination point. Run quick post-incident reviews and update playbooks to reduce future risk. For state curfew and escort details see state-specific curfew rules for oversize loads.

How it works

People-thumbs up
Step 1

Pricing: Simply fill out the Free Quote Form, Call, or Email the details of your shipment

Simply complete our quick online quote form with your shipment details, call to speak with our dedicated U.S.-based transport agents, or email us at info@freedomheavyhaul.com with your specific needs. We’ll respond promptly with a free, no-obligation, no-pressure, comprehensive quote, free of hidden fees!

Our team has expert knowledge of hot shot, flatbed, step deck, and RGN trailers, ensuring you get the right equipment at the best price for your shipment.

Step 2

Schedule: ZERO upfront cost to begin working on your shipment

At Freedom Heavy Haul, we’re all about keeping it SIMPLE! We require ZERO upfront costs, you only pay once your shipment is assigned to a carrier. Just share your pickup and delivery locations and some basic info, and we’ll take it from there!

For non permitted loads, we can often offer same-day pickup. For larger permitted loads, a little extra time may be required for preparation. Rest assured, no matter the size or complexity of your shipment, we manage it with precision and commitment!

watch
Truck
Step 3

Complete: Pick up → Delivery → Expedited

Heavy hauling can be complicated, which is why it’s essential to trust a team with the experience and expertise needed. Freedom Heavy Haul has specialized in Over-Dimensional and Over-Weight Shipment deliveries since 2010! Rest assured, you’ve come to the right place.

From the time your load is assigned you will be informed every step of the way. Prior to pick-up the driver contact you to arrange a convenient time to load the shipment, at pick-up the driver will conduct a quick inspection of the shipment. Prior to delivery the driver will again schedule an acceptable time and complete final inspection to ensure the load arrived in the same condition.

Good Work = New Work! Trust Freedom Heavy Haul as your future partner for equipment transport.

Map

Freedom Heavy Haul

Specializing in Heavy Equipment Hauling and Machinery Transport

Get Quote