We Navigate How Midwest Construction Seasons Impact Heavy Haul Routes

Freedom Heavy Haul can offer expedited Pickup and Delivery for any size shipment anywhere in the USA. Contact us today for No Hassle, No Pressure Pricing.

We set the stage for this ultimate guide. We define how we keep programs moving freight across major corridors like I-94, I-90/I-39, US 41/I-41, and Highway 151.

Seasonal shifts do not surprise us. We plan staffing, permits, and equipment to run all year. Our mix of asset-based reliability and brokerage flexibility keeps lanes steady.

Safety and clear communication are core to our services. We use corridor intelligence to protect equipment and maintain steady flow. That lowers risk and improves predictability.

We preview how we match rates to capacity swings. You will learn how frost laws, winter storms, and peak work affect moving freight. We explain permits, escorts, and surveys so you know the ground rules.

By the end, you will have actionable frameworks to keep freight movement on time and damage free. We show why the right partner shortens the distance between problems and solutions.

Why This Ultimate Guide Matters to Midwest Heavy Haul Right Now

We see schedule pressure rise when urban choke points and peak projects coincide. The Chicago effect alone can add hours to transit and change pickup windows.

This guide explains the real-world effect of corridor work on rates and on our day-to-day operations. Winter shutdowns in Wisconsin and May–October project intensity create predictable constraints.

Inbound capacity tightens when production and consumption fall out of balance. The best carriers plan for these shifts. We hold consistent lanes and keep communication proactive.

“Advance notices, reliable lanes, and real-time updates turn uncertainty into control.”

  • We map lead-time changes and rate pressure so you can budget smarter.
  • We show tendering, appointment, and route checks that reduce missed pickups.
  • We use data feeds and local partnerships to keep moving freight despite detours.

Adopt earlier tenders and flexible windows. These small policy shifts protect service and limit cascading delays.

Defining the Midwest Construction Season and Its Ripple Effects on Freight Movement

From June through September, corridor work shifts normal timing and capacity on key interstates. We track project calendars and use that data to set carrier plans.

Where and when projects peak. Wisconsin sees concentrated activity June–September, with heavy work along I-94 and I-90/I-39. Daypart congestion varies by scope and by nearby urban centers.

Bottlenecks and compound delays

Lane reductions and ramp closures create predictable choke points. Stacked work zones plus urban traffic can add hours near Chicago and Madison interchanges.

Infrastructure, requirements, and maneuverability

Bridges, narrow shoulders, and height limits force special permits or detours. That changes trailer choice and escort needs for larger configurations.

What we do. We monitor projects daily and adjust timing and paths. Off-peak moves and alternate corridors reduce secondary delays at chokepoints.

Real-time corridor insight lets us protect commitments without exposing drivers to unsafe merges.

  • We map project clusters and anticipate lane reductions.
  • We set yard and dock buffers to absorb on-road variability.
  • We document special requirements so equipment matches constraints and transit stays safe.

How Midwest Construction Seasons Impact Heavy Haul Routes

Active work zones along key interstates create predictable slowdowns we plan around. We spot where delays form and cut exposure with clear plans and fast communication.

From planning to delivery: where delays and costs accrue

Where delays happen. Permit timing swings, pilot car scheduling, queueing at lane drops, and low-speed work zones add minutes and hours.

Cost drivers. Added miles for detours, extra labor for escorts, and idle time at work zones raise costs and push rates higher.

Examples of lane disruptions and reroutes during peak projects

Example: A reroute off I-94 during peak projects added 28 miles and required a permit update. We re-time pickups and send revised ETAs to protect deliveries.

“Proactive permitting and real-time updates keep docks ready and drivers safe.”

Issue Effect Mitigation
Permit timing Dispatch delays Early tendering
Pilot car scheduling Idle hours Pre-book escorts
Lane drops Queueing Staging near projects
Detours Added miles Pre-approved alternates

We tie lane intelligence to bidding and rate plans. For details on budgeting and heavy haul trucking costs in Iowa, review our cost guide.

The Seasonal Freight Cycle: Winter, Spring Thaw, Summer Construction, Fall Stability

The year’s cycle creates predictable windows of strain and relief for freight capacity. We break the calendar into four practical phases so you can align carriers and equipment with demand.

Capacity constraints and rate patterns by season

Winter adds transit time and a reliability premium. We plan extra buffer hours and tow extra equipment when needed.

Spring brings thaw limits that reduce permissible weights. We use lighter configurations and alternate corridors to comply. For more on thaw rules, see our spring thaw planning.

Summer raises unpredictability and tightens rates during peak projects. Fall usually steadies volumes but shows higher demand from paper and food sectors.

Balancing schedules, consistent lanes, and service levels year-round

“Locking consistent lanes and schedules lowers variability and reduces total cost.”

We recommend fixed windows carriers can build into networks. Consistency improves driver familiarity and cuts detention.

  • Lock schedules to stabilize utilization.
  • Use consistent lanes to improve appointment performance.
  • Apply seasonal playbooks—earlier ETAs in winter, staging for thaw, off-peak moves in summer.

Spring Thaw and Frost Laws: Seasonal Weight Restrictions You Must Plan For

Soft ground in early spring changes what we can move and where we can drive it. Frost laws typically begin as early as February or March and taper off in April or May. These temporary limits protect local surfaces.

Variations in local rules

Frost laws vary by state, county, and town. There is no federal calendar. Jurisdictions set weight and speed limits based on conditions. Even otherwise legal loads can be restricted.

First-mile and last-mile barriers

Small township roads are often the problem. A main corridor may be open, but the last mile in can be closed. That blocks pickups and deliveries more than long-distance segments.

Costs, detours, and penalties

Penalties include fines, forced offloading, or redistribution. Detours add miles and drive up cost and rates. Some areas apply per-mile seasonal surcharges.

  • Our approach: pre-check jurisdiction calendars and secure alternates early.
  • Use lighter loads or extra axles to meet local requirements.
  • Maintain a steady communications cadence with clear ETAs and revised quotes.

“We never risk non-compliance; planning and checklists protect equipment and schedules.”

For specifics on aligning schedules with seasonal weight limits, contact us for route-level guidance.

Winter Operations: Weather, Routing, and Reliability in Harsh Conditions

When ice and heavy snow arrive, we add margin and move to safer paths. We do this to protect drivers, equipment, and schedules.

Snow and ice change traction and braking distances. That raises on-road risk and can force corridor closures.

We build extra transit time into plans and send precise updates so docks and yards can adjust. GPS tracking gives live visibility. Driver communication systems deliver clear, distraction-minimized messages.

  • We equip vehicles for cold starts, tire integrity, and fuel management.
  • We favor safer routes over marginally faster ones to avoid steep grades and narrow passes.
  • We keep contingency windows for storms and adjust appointments proactively.

We monitor weather in real time and escalate alternates before closures lock in. We also maintain coordination with state patrols and road authorities for travel advisories.

“Elite carriers build extra transit time and communicate exceptions immediately.”

Winter Challenge Operational Response Customer Benefit
Snow/ice traction loss Route selection and speed advisories Lower accident and damage risk
Corridor shutdowns Pre-planned detours and contingency windows Faster recovery and fewer missed appointments
Cold starts and fuel issues Vehicle prep and cold-weather kits Higher uptime and reliability
Driver fatigue in storms Wellness checks and adjusted schedules Safer operations and consistent service

Summer Construction Season: Real-Time Rerouting and Corridor Management

Summer work brings sudden detours that test any carrier’s planning and responsiveness. From June through September we track projects hourly and convert that data into live updates for drivers and dispatch.

We feed active project information into dispatch so drivers receive real-time detour guidance. That minimizes unplanned delays and protects transit times.

Tracking projects and dynamic detours in practice

We maintain a project feed that flags lane shifts, closures, and pilot car needs. Dispatch pushes reroutes and permit notes directly to driver tablets.

Optimizing appointment windows to avoid peak congestion

We stagger pickup and delivery windows to miss peak merges and work-zone queues. This reduces dock wait and lowers exposure to peak-day delays.

“Proactive updates and staged appointments turn congestion into predictable workflow.”

  • Live feeds: project status links into routing tools.
  • Staggered windows: avoid peak work-zone merges.
  • Detour playbooks: Chicago bypass options save hours when timed correctly.
  • Rate planning: early tendering reduces summer rate spikes for critical lanes.
  • Pre-trip checks: signage, lane shifts, and shoulder reductions verified before dispatch.
Challenge Operational Action Driver Benefit Customer Outcome
Unexpected detours Dynamic routing with live updates Clear directions, fewer stops Steady transit times, fewer exceptions
Peak-day merges Staggered appointment windows Reduced queueing at work zones Lower detention and on-time delivery
Rate pressure Early tendering and lane commitments Stable work and predictable pay Controlled rates and better budgeting
Multi-project overlap Alternate corridor activation Safer, less congested paths Recovered hours without added risk

Wisconsin as a Midwest Logistics Hub: Corridors, Constraints, and Opportunities

Wisconsin sits at a crossroads of national lanes that shape daily freight movement. We profile core roads, identify repeat pinch points, and set lane tactics that keep loads moving.

I-94, I-90/I-39, US 41/I-41, and Highway 151 in focus

I-94 links Milwaukee and Madison to Minneapolis and Chicago. I-90/I-39 carries cross‑state traffic and sees frequent work that creates delays.

US 41/I-41 connects Green Bay and the Fox Valley to Milwaukee. Highway 151 ties Madison to Dubuque and supports regional freight volumes.

The Chicago effect on transit times and routing decisions

Chicago traffic can add hours to cross-border legs. That shifts our timing and pushes us to use bypass options for steady transit times.

“When downtown congestion spikes, we stage earlier and use off-peak windows to protect schedules.”

  • Infrastructure hotspots: interchanges, bridges, and work zones that need plan-B paths.
  • Seasonality: peak project windows amplify variability; we smooth flows with staging and off-peak moves.
  • Capacity constraints: outbound production strength tightens inbound options; we pre-position equipment by day.
  • Industry drivers: paper, food, and machinery require tailored equipment placement across the week.
Corridor Common Issue Typical Delay Mitigation
I-94 Work zones and lane drops 30–90 minutes Staged pickups; alternate ramps
I-90/I-39 Frequent project activity 20–60 minutes Pre-approved detours; permit checks
US 41/I-41 & Hwy 151 Local bottlenecks and bridge limits 15–45 minutes Equipment swaps; off-peak windows
Chicago cross-border lanes Peak congestion 1–3 hours Bypass corridors; night moves

Route Planning for Heavy Loads: Permits, Surveys, Escorts, and Time-of-Year Factors

Permit windows and physical surveys set the pace for moving large, over-dimension loads safely. We begin by mapping permit timelines and fees to your exact configuration. Fees range from about $8 to over $20,000 depending on state, route, and size.

Permitting timelines. We secure approvals early. Strong relationships with state and local authorities speed approvals and clear questions before they become delays.

Permits, surveys, and escorts

Some jurisdictions require formal route surveys or escorts for tall or wide shipments. Surveys catch low limbs, narrow passes, and bridge limits before a truck moves.

Escorts reduce operational risk but add cost. We weigh paying for escorts versus planning alternate paths to control rates and overall cost.

“Early surveys and proactive approvals turn unknowns into predictable steps.”

  • We align vehicle specs—axle count, deck height, and clearance—with infrastructure limits.
  • We fold curfew rules, holiday limits, and spring thaw restrictions into routing models before booking.
  • We add redundancy with alternate paths, staged equipment, and contingency ETAs to lower risk.
Item Typical Range When Required Benefit
Permit fee $8 – $20,000+ All oversized/overweight moves Legal clearance and reduced fines
Route survey $250 – $2,000 High verticals, tight corridors Prevents surprises and rework
Escort $75 – $200 per hour Wide/long/over-height thresholds Safer transit and authority compliance
Seasonal surcharge Varies by state Spring thaw or holiday curfews Maintains network access and avoids penalties

Carrier Selection That Withstands Seasonal Stress

We pick carriers that hold up when weather, work zones, and demand spike at once. Our selection focuses on partners who combine asset-based reliability with brokerage reach. That mix preserves capacity and keeps operations steady during peak pressure.

Why a blended model matters. Asset carriers deliver 99%+ pickup reliability and 97%+ on-time delivery for assigned loads. Brokers expand options when local capacity constraints tighten.

Equipment availability for specialized loads

We prioritize fleets with diverse trailers, drop pools, and specialty gear. That ensures we can place over-dimensional and specialized shipments without long delays. Trailer pools improve yard flow and reduce detention.

Service metrics that prove performance

We track pickup reliability, on-time delivery, and claims ratios. Claim ratios below 1% show quality. We audit safety records, billing accuracy, and proof-of-delivery speeds to protect your service and limit damage.

  • We weigh rates against proven performance so the cheapest option does not become the costliest failure.
  • We require communication flexibility (EDI, email, phone) and real-time visibility for fewer exceptions.
  • We build seasonal playbooks with core carriers to lock consistent lanes and align drivers to critical weekly windows.
Metric Target Benefit
Pickup reliability 99%+ Fewer missed loads
On-time delivery 97%+ Predictable schedules
Claims ratio <1% Lower damage and cost

Capacity, Rates, and Transit Times: What Changes as Seasons Shift

Market pulses change with project intensity and holiday demand, and we plan to stay ahead. We map timing and pricing so your shipments avoid surprise premiums.

Rate peaks during project and pre-holiday windows

Rates rise most in summer construction season and again before major fall holidays. Winter and early spring often offer softer market leverage for contracting.

We recommend locking agreements in slower months to avoid premium spot pricing when capacity constraints tighten.

Securing consistent lanes and trailer pools to stabilize service

Consistent lanes and trailer pools boost carrier acceptance and cut delays. They also smooth capacity swings tied to freight volumes and local project calendars.

  • Align lead times on critical Wisconsin corridors and Chicago bypass windows.
  • Set a cadence for rate reviews so budgets match market movement.
  • Use pooled trailers to lower detention and improve acceptance.
Timing Rate Pattern Action
Summer / construction season High Early tendering; alternate corridors
Pre-holiday fall Peak Secure lanes; add trailer pools
Winter / spring Soft Negotiate contracts

Operational Playbook: Scheduling, Dock Turns, and Inventory Alignment

A disciplined dock cadence keeps trailers turning and carriers confident in our lanes. We set clear schedules and use off-peak appointments—6–8 a.m., early afternoons, and night windows—to avoid inbound congestion and improve on-time deliveries.

Off-peak appointments and faster turns to improve carrier acceptance

We target sub-2-hour turns. Labor planning and pre-staging goods reduce handoff time. Faster turns raise carrier acceptance and lower detention exposure.

Dock scheduling systems and warehouse strategies during constraints

Digital dock scheduling reduces dwell. Trailer pools and drop-trailer programs support 24/7 facilities and keep flow steady when freight volumes spike.

“Operational discipline at the yard level converts congestion into predictable throughput.”

  • Off-peak schedules: avoid peak merges and protect on-time deliveries.
  • Faster turns: labor alignment and pre-staging to hit sub-2-hour targets.
  • Dock technology: scheduling systems cut dwell and improve carrier satisfaction.
  • Inventory alignment: stage stock to match seasonal constraints and protect service.
  • Coordination: plan freight volumes and yard space with carriers; use drop trailers to preserve flow.
  • Rates link: faster turns and reliable operations lead to more competitive rates.

We run KPI dashboards to expose bottlenecks and measure gains. The result is a weekly playbook teams can run regardless of external pressures.

Technology and Communication: Visibility, TMS Integration, and Weather Intelligence

Clear, live updates let us reroute before delays become problems. We rely on technology to keep drivers safe and customers informed.

GPS tracking delivers more reliable visibility than driver-dependent systems. It gives precise location and timing so docks know when to expect a load. Integrated driver comms, like Samsara, add status without distraction and keep data clean.

GPS tracking vs. driver-dependent updates

GPS reduces manual check-ins and missed messages. Drivers spend less time on calls. Dispatch sees exact movement and can act faster on exceptions.

EDI, email, phone flexibility and exception management

We connect our TMS to customer systems for smooth tendering, scheduling, and invoicing. We support EDI, email, and phone so teams use the channel that fits their process.

“Fast exception handling cuts dwell and lowers the chance of surprise fees.”

Weather and traffic monitoring for proactive rerouting

We watch weather and traffic in real time and trigger routing changes before delays form. That reduces risk and protects supply chains and rates.

  • We adopt GPS tracking for accurate, real-time updates that reduce uncertainty at your docks.
  • We integrate driver comms to improve safety and data integrity.
  • We connect TMS to customer systems for seamless scheduling and billing.
  • We monitor weather and traffic continuously to enable proactive routing changes.
  • We manage exceptions fast, lowering risk of missed appointments and extra fees.
Capability Operational Benefit Customer Outcome Metric
GPS tracking Immediate location visibility Fewer missed appointments ETA accuracy +30%
Integrated driver comms Safer, distraction-minimized updates Cleaner status data Exception resolution time −40%
TMS integration Automated tendering and billing Smoother invoices and faster turns Billing cycle −25%
Weather & traffic feeds Proactive rerouting Reduced delay minutes Delay minutes −35%

We quantify ROI from visibility solutions in avoided dwell, stabilized supply, and better rates. Post-trip data capture then feeds continuous improvement. The result is lower risk and steadier service for your operation.

Modal Strategies: FTL, Partial/LTL, Flatbed, and Intermodal During Seasonal Shifts

We use modal choice to lock service and cost outcomes. Mode selection is a tactical lever we use to match service and budget through the year. Picking the right mode reduces touches and improves predictability.

When partial truckload outperforms traditional LTL

For 4–12 pallets, partial truckload often beats LTL. Fewer terminals mean fewer touches and a lower damage risk. Transit is usually faster.

Coverage clarity differs between partial and LTL. Partial gives clearer timelines and better appointment precision for time-sensitive loads.

“Consolidating pallets into a partial lowers handling and speeds delivery.”

Matching equipment to industry needs and seasonal availability

In Fox Valley and Green Bay, dry van capacity is plentiful for paper. Milwaukee offers diverse gear, including flatbed options for machinery and lumber.

  • We compare FTL, partial, LTL, flatbed, and intermodal by lane and month to match goals.
  • We map equipment requirements for paper, machinery, and food to avoid on-site swaps.
  • We price rates with realistic lead times and use backhaul opportunities to lower cost.
  • Contingency modes are staged when primary lanes face work or closures.

Example: Consolidating 6–8 pallets into a partial can arrive faster than LTL because it skips extra terminals and moves in fewer segments.

Service expectations vary by mode. We set visibility, appointment precision, and contingency plans up front so your shipment moves with minimal disruption and clear communication of services.

Putting It All Together: Your Next Move to Keep Heavy Loads Flowing Through the Year

We translate corridor intelligence and carrier capability into a simple execution plan. , We assign owners, set quarterly KPIs, and lock cadence for trailer pools and consistent lanes.

We align delivery expectations to seasonal realities. That means winter reliability premiums, spring thaw limits, summer detours, and fall volume buffers. We budget permit ranges ($8–$20,000) and bake roads and infrastructure checks into route plans.

We match solutions to your industry and equipment profile to cut damage and lower costs. We formalize communication standards, use weather and traffic feeds for rerouting, and hold quarterly reviews to refine lanes and transit times.

Use this route planning primer and our checklist to execute the next shipment with confidence.

FAQ

Q: What months see the busiest construction activity and greatest effect on heavy loads?

A: Peak activity usually runs from late spring through early fall. Work ramps up after thawing in April–May, peaks in June–August, then tapers in September–October. Those months bring more lane closures, detours, and traffic that slow transit and raise costs.

Q: How do spring thaw and frost laws change routing and weight limits?

A: Frost laws impose seasonal weight and axle restrictions to protect weakened pavements. Rules differ by state and county and often kick in during spring thaw. Carriers must reroute, reduce loads, or secure temporary permits to avoid fines and road damage.

Q: What typical delays should we budget for during major corridor projects?

A: Expect slower speeds, planned detours, and single-lane traffic that add transit time. Delays vary from 30 minutes to several hours per leg depending on project scale. We plan extra time into schedules and use alternate corridors where permitted.

Q: Which Wisconsin and regional corridors require special attention for oversize loads?

A: Key corridors include I-94, I-90/I-39, US 41/I-41, and Highway 151. These routes see heavy traffic and frequent construction. We monitor restrictions and Chicago-area bottlenecks closely when routing through these arteries.

Q: When are permits, route surveys, and escorts required for large shipments?

A: Permits are typically required for oversize or overweight loads year-round. Surveys and police or commercial escorts become mandatory when dimensions or route hazards exceed thresholds, for bridge crossings, or for urban moves. Lead time varies by state—plan weeks in advance for complex permits.

Q: How do winter conditions affect reliability and costs for heavy transports?

A: Snow, ice, and reduced visibility increase risk, slow speeds, and cause cancellations. We factor additional fuel, equipment prep, and possible re-staging into winter rates. Reliable carriers with winterized fleets reduce downtime and claims risk.

Q: What rate and capacity patterns should shippers expect across the year?

A: Rates rise in late spring and summer as construction demand and capacity constraints tighten. Pre-holiday surges also push prices. Fall and deep winter often show more stable lanes and lower spot rates, though weather can still spike costs.

Q: How can shippers balance schedules to avoid peak congestion and improve carrier acceptance?

A: Use off-peak pickup windows, stagger deliveries, and consolidate loads where possible. Early booking and guaranteed appointment windows make lanes more attractive to carriers. We also recommend trailer pools to stabilize availability.

Q: What penalties or costs result from ignoring seasonal weight and routing rules?

A: Non-compliance can lead to fines, load seizures, repair bills for infrastructure damage, and increased liability for carriers and shippers. Preventative planning and permitting avoid these unnecessary costs and operational disruptions.

Q: Which technology tools help manage seasonal disruptions in real time?

A: TMS integration, GPS tracking, weather and traffic feeds, and mobile communications provide the visibility needed to reroute instantly. Combining automated alerts with human dispatch oversight yields the best outcomes during sudden detours or closures.

Q: When is intermodal or partial truckload preferable to a full flatbed in seasonally constrained periods?

A: Use intermodal or partial loads when road restrictions, bridge limits, or urban permits complicate direct trucking. These modes can reduce damage risk and cost for certain commodities, and they help maintain flow when truck capacity is tight.

Q: How do we estimate additional budget for escorts, surveys, and extended transit during peak projects?

A: Build contingency for permit fees, survey costs, escort hourly rates, and extra driver time. For major moves, allocate 10–25% above base shipping costs depending on route complexity and seasonal restrictions.

Q: What carrier selection criteria matter most during seasonal stress?

A: Prioritize carriers with specialized equipment, strong safety records, and local permitting experience. A mix of asset-based capacity and brokerage flexibility helps maintain service when lanes tighten.

Q: How can project managers keep inventory and delivery schedules aligned through the year?

A: Coordinate long-lead items to avoid peak-season shipping, maintain buffer stock for critical components, and align dock windows with off-peak carrier availability. Regular communication with carriers and suppliers reduces last-minute disruption.

Q: What steps reduce damage and claims risk for oversized or heavy shipments in construction zones?

A: Use proper blocking, cradles, and straps; choose carriers experienced with over-dimensional freight; and route around known hazards. Pre-move surveys and documented condition reports further protect assets and lower claims exposure.

How it works

People-thumbs up
Step 1

Pricing: Simply fill out the Free Quote Form, Call, or Email the details of your shipment

Simply complete our quick online quote form with your shipment details, call to speak with our dedicated U.S.-based transport agents, or email us at info@freedomheavyhaul.com with your specific needs. We’ll respond promptly with a free, no-obligation, no-pressure, comprehensive quote, free of hidden fees!

Our team has expert knowledge of hot shot, flatbed, step deck, and RGN trailers, ensuring you get the right equipment at the best price for your shipment.

Step 2

Schedule: ZERO upfront cost to begin working on your shipment

At Freedom Heavy Haul, we’re all about keeping it SIMPLE! We require ZERO upfront costs, you only pay once your shipment is assigned to a carrier. Just share your pickup and delivery locations and some basic info, and we’ll take it from there!

For non permitted loads, we can often offer same-day pickup. For larger permitted loads, a little extra time may be required for preparation. Rest assured, no matter the size or complexity of your shipment, we manage it with precision and commitment!

watch
Truck
Step 3

Complete: Pick up → Delivery → Expedited

Heavy hauling can be complicated, which is why it’s essential to trust a team with the experience and expertise needed. Freedom Heavy Haul has specialized in Over-Dimensional and Over-Weight Shipment deliveries since 2010! Rest assured, you’ve come to the right place.

From the time your load is assigned you will be informed every step of the way. Prior to pick-up the driver contact you to arrange a convenient time to load the shipment, at pick-up the driver will conduct a quick inspection of the shipment. Prior to delivery the driver will again schedule an acceptable time and complete final inspection to ensure the load arrived in the same condition.

Good Work = New Work! Trust Freedom Heavy Haul as your future partner for equipment transport.